Search
JUNXY Series Rack Mounted Load Banks
When building a new data center, the owner of the data center has no guarantee that the various physical infrastructure subsystems – power, cooling, fire suppression, security, and management – will work together. Commissioning is the process that reviews and tests the data center’s physical infrastructure design as a holistic system in order to assure the highest level of reliability.

It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance. Critical power backup equipment like UPS System and generator which especially located in harsh, dusty or corrosive environment will fail without proper preventative maintenance. So validating the condition and output of such power systems must be conducted comprehensively. JUNXY provides a whole range of custom preventative maintenance products solutions for UPS systems and generators and many more to ensure constant uptime for your power systems and make you prepared for anything.

 

Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient facility and higher than expected operational costs. By simply identifying where equipment manufacturers’ standard specifications are not appropriate for the IT load, the supporting infrastructure, in particular the cooling plant, can be configured to meet the requirements of the facility and lead to much higher levels of efficiency. Data centre commissioning can lead to significant energy savings when implemented correctly by a specialist commissioning team. By engaging JUNXY power solutions to ensure that systems are running correctly, clients have saved up to 67% on facility operational costs.

 

The Junxy rack mounted AC & DC load banks are designed especially for internet data center (IDC) test and commissioning. Load bank integrated system test (IST) could precisely simulate the data center’s electricity consumption, heat dissipation, air flow, hot & cold aisle testing, thus to ensure the effective operation of power supply & distribution system (generator, UPS, EPS included), air conditioning system, lightning protection and earthing system, monitoring system, data center integrated environments, cabinet IT environment, providing independent verification of integrated system testing. Successful IST(integrated system test) should have installation of server load banks in data center and server room etc, Junxy provides resistive, reactive and capacitive load banks in low or medium voltage to cover the entire scope of your commission and testing requirements.

 

Applications

--Data center & server room cooling system test

--Data center air flow, hot/cold aisle environment inspection

--Validating the tire level of data center

--Validating the reliability of data center power supply & distribution system

--Testing the main network before connecting user devices (servers, switches, etc.)

 

Technical Specifications

Models

AC120V-3KW

AC230V-3KW

AC230V-6KW

AC230V-10.5KW

DC270V-3KW

DC270V-6KW

Capacity

3KW

3KW

6KW

10.5KW

3KW

6KW

Customized solutions could be available upon request.

Rated Voltage

AC120V

AC230V

DC270VDC

Customized solutions could be available upon request.

Minimum Load Step

250W

250W

500W

500W

100W

100W

Customized solutions could be available upon request.

Air Quantity

480CFM

480CFM

680CFM

1040CFM

680CFM

880CFM

Dimension

3U

4U

6U

9U

4U

4U

19’’ Standard Rack

Options

Air flow control and display, digital meter, remote control

Cables

C13 C14

 

Product Search
脚注信息
Copyright(C)2009-2012 Electronic equipment company